Since the beginning of 2025, the Xingnan Oilfield of Daqing Oilfield has focused on achieving the "one increase and two decreases" goal in the management of mechanically extracted wells (increasing production uptime, reducing pump inspection rate and pump inspection cycle). Through three major measures: meticulous production management, optimized process design, and strengthened on-site supervision, the operational efficiency of mechanically extracted wells has been significantly enhanced. As of August, the production uptime of oil wells in the Fifth Oil Production Plant of Xingnan Oilfield reached 94.84%, the pump inspection rate of mechanically extracted wells decreased by 1.5% year-on-year, and the pump inspection cycle was shortened by 22 days.
I. Fine-grained Management Solves Development Challenges
The Xingnan Oilfield has been in operation for over 50 years and is now facing challenges such as complex produced fluid composition, a high proportion of slant wells, and the coexistence of water and polymer flooding, which have made the management of mechanical production indicators difficult. In 2025, the technical team took targeted measures:
1. Dynamic Optimization of Process Parameters: Adjusted the production parameters of 893 oil wells, formulated plans for wells with abnormal liquid volume and liquid properties, and implemented parameter adjustments 142 times using an intelligent diagnostic platform.
2. Precise Management of Abnormal Wells: Analyzed the causes of 324 abnormal wells, formulated 398 long-term measures, optimized the tubing string matching plan, and reduced maintenance frequency.
II. Digital Platform Empowers Efficient Control
Relying on the digital production control platform, real-time monitoring and intelligent handling of production data are achieved:
- Optimized alarm thresholds and handling procedures, processed 32,079 alarm messages within the year, and increased oil production by over 1,400 tons.
- Improved data accuracy and abnormal response speed, reducing the number of night shutdown wells by 60%.
